Where snow buildup is likely add a wide band of peel and stick membrane lapped over the step flashing but under the sheathing wrap.
Roof to stucco wall flashing detail.
The flashing extends onto the roof a minimum of 2 inches 4 inches is preferable in more severe climate areas.
The flashing extends up the wall at least 4.
Slip the wall leg of the weep screed behind the existing paper.
The metal flashing is formed with a hook edge and cleated on 12 centers.
Where a slope roof meets a sidewall slip the upper legs of the step flashing under the sheathing wrap see illustration.
Wall to roof deck flashing 2020 detail.
Flashing joints are lapped 6 in the direction of water flow.
Installing step flashing to stucco walls step 1.
Stucco parapets 2020 detail.
Control joint at floor line 2016 detail.
Corners for stucco 2020.
Sill pan for nail flange windows 2020 detail.
Flashing a nail flange window 2018 rev detail.
Be sure to overlap the old felt with the new felt by a foot and secure it with nails.
Add cement and flashing.
The new roof is going to be laminated asphalt shingles.
Kick out flashing for stucco 2019 detail.
Layer the cement on the area that you.
Additional information for flashing single wythe walls particularly architectural concrete masonry walls and means for providing a higher level of structural continuity at flashings is contained in tek 19 2a ref.
Click to enlarge make sure the sheathing wrap overlaps all step flashings.
In this video kirk giordano demonstrates how to counter flash the bottom of a stucco wall over the step flashing of the roof so that no one has to jackhammer your walls just to fix a roof.
Alternatively a cap flashing can be regletted into the foam sheathing with tape forming a transition to the cap flashing.
For step flashing with a stucco wall you will be working in part on the roof.
Roof to wall flashing with foam sheathing upturned leg of step flashing sealed to wall drainage plane with adhesive membrane.
Lay 2x4 blocks on the roof to set a consistent height for the weep screed flashing.
Top edge of adhesive membrane is taped to drainage plane with sheathing tape.
Next you will use asphalt or roofing cement.
It cannot be pulled out from behind the stucco because the weep screen at the bottom of the stucco is attached to the wall with nails.
Cantilevered deck joist stucco 2020 detail.
Installing the roofing felt.
Flashing single wythe walls at the ends of bar joists which utilize wall pockets for bearing is shown in figures 8 and 8a.