3 9 roof edges applicability a roof edge detail should be installed as specified by the designer at all flat edges of the roof where the field membrane ends and at internal and external gutters.
Rubber flat roof drip edge detail.
Roof edge termination with metal drip edge.
Install the new drip edge as described above with.
Once free slide the drip edge out and discard.
Firestone has developed cad drawings of its epdm installation details to assist roofing professionals with the specification of firestone epdm roofing systems.
Rubber roof repair kit available on amamzon.
The standard roof edge details illustrated in this section are generally applicable.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto the roof.
Discover our range of flat roof trims epdm edge trims gutter trims and wall trims suitable for any roofing project big or small.
Find and fix a leaking roof.
Consult firestone s technical department for assistance when.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
12 roof repair tips.
The detail drawings are grouped by detail type and can be downloaded below in dwg or pdf format.
If you re looking for premium quality industry standard cost effective edging our unique line of products will give your flat roof a smart professional look while preventing damp and condensation from infiltrating your roof.
Prior to installing the metal drip edge sand the metal with sand paper.
Find everything you need to give your flat roof a visually pleasing finish with our full range of roof edge trims.
First you need to fully bond the membrane over the roof ege and then allow the membrane to extend past the previous roofline and nail it every 1 219mtrs centrally.
This lets any water that gets on the roof run down the underlayment and over the drip edge.
This is done with kerb edge trims these not only keep the water on the roof thanks to a built in up stand but also cloak the fascia to make the finish look smart from the floor.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.